Log cabin, additional dirt work

      The dirt is still moving, we tapped into a vein of pit run cinders, poor mans gravel. We are using this for the roads and for the drainage areas. Regular fill dirt is being used for up against the building.


 The height you see the upper section of the dirt is where the deck will start and go all the way around the building.
This is a picture of the back corner, the black pipes you see are for the sewer system. There will be a small block retaining wall added just past the last pipe so that there is access to the septic tank. Once the mini wall it up there will be additional dirt to cover up the piping you see.