Log cabing Tuesday BCI's

      We got up a good amount of BCI's today after spending half the day anchoring and leveling the logs that they sit on but it worked out well. For tomorrow we will be putting on the OSB sheeting and then the barrier that we have, the metal roofing for the finish is set to be ordered.
      You can see the pockets for the logs, we have 5/8 X10 bolts securing them to the wall then we blocked the sides and top and added 1' long screws.
     Side view shot. There will be a walkway all around the log section of the building and then an additional roof above that, it will tie in at the end of the BCI's that you see resting on the logs and continue down where you see the white strip below the T-111.






Prepology

No comments:

LinkRef

free web site traffic and promotion